

M48 standard mobile stage
The weather-resistant, anti-slip, 48 m2 mobile trailer stage with standard / flat roof is an accessory of events and outdoor performances!
Technical specifications
Roof structure: standard
Stage dimensions (unfolded): 8.0 m x 6.0 m x 5.0 m
Trailer dimensions (folded): 9.4 m x 2.45 m x 3.6 m
Roof elevation mechanism: manual-hydraulic or electro-hydraulic
Stage floor levelling mechanism: manual or electro-hydraulic
Permissible maximum gross weight: 2,500 kg
Stage floorspace: 48 m2
Stage floor height: 1.0 - 1.3 m
Stage floor surface: anti-slip, weather-resistant
Roof load capacity:
- Load capacity of 320 kg spread evenly at the front and the rear of the roof (end tube)
- Load capacity of 80 kg spread evenly at the front and the rear of the roof (middle tube)
- Load capacity of 560 kg spread evenly in the middle of the roof
Stage load capacity: 3.5 kN/m2 (350 kg/m2)
Rectangular (grid support) pillars load capacity: 50 kg
Flying towers load capacity: 250 kg (in the centre)
Maximum wind speed: Wind zones 1-3., with the exception of coastal areas with a minimum width of 5 km, as well as islands of the North Sea and the Baltic Sea: a maximum of 17.8 m/s with hind and side panels and a maximum of 27.5 m/s without panels
Permissible maximum thickness of snow on the roof: Mobile sections may only be used in snow-free times; otherwise, effective measures (for instance installation of adequate heating) need to be taken to clear the snow
Canopy material: PVC-certified material (flame resistant)
Side panels (rim) material: A203 (white or black)
Installation time: 30 minutes (1-2 member(s) of staff)
All our products comply with the most rigorous and latest international standards of Eurocode 0, Eurocode 1, Eurocode 3 and Eurocode 9.
It is of great significance for us that our products adhere to the latest standards and regulations.
Fittings and additional equipment may only be transported separately!



Educatio Digitale Lernsysteme GmbH participated as an exhibitor on the 8th German Management Training Congress at the Berlin Estrel Congress. They were looking for a supplier that could offer an innovative, cost-effective, fast and safe solution t...
Project details
During the modernization of the marketing communication system from August to October 2021 we have replaced the outdoor and indoor LED walls of the Allee Shopping Mall. A part our tasks was the modernization of the controls: we had to enable the o...
Project details