Project

The assignment consisted of the installation and operation of sport technology equipment: timekeeping and scoreboard systems in the Tiszavirág Swimming Centre in Szeged.

Challenge

Our tasks extended to the installation and setting up of a complete swimming and water polo timekeeping system with its supplementary accessories (shot clocks, touch pad, 30 OMEGA starting blocks) as well as an LED scoreboard system with its respective ProVideoPlayer (PVP) software.

Solution

We installed Swiss-manufactured OMEGA equipment complying with international standards, as well as a 24.57 square meter LED scoreboard with *P8 resolution, using **SMD technology along with shot clocks, in line with the international water polo regulations.

Since the competition pool is equally suitable for 25-meter short course competitions owing to the movable bulkhead, we have also built in a 2 x 1 meter mobile LED scoreboard. The mobile scoreboard is suited for displaying data parallel with the central scoreboard and the two can thus be synchronized.

► Project location: the Tiszavirág Sports Swimming Pool

Address: 6723 Szeged, Etelka sor 3-5/a

*P value (pixel distance): The LED modules are made with light-weight diodes, spaced 1.8 to 10 mm apart. The P value represents the relative value of the diodes, expressed in millimetres both in the vertical and the horizontal direction.

**SMD: The new-generation, recessed, cube-shaped LEDs are durable, highly visible from a distance, and provide a more enjoyable visual experience.

Project categories
Sport event
Technological elements of the project
LED scoreboardLedSmart Score System
Tiszavirág Swimming Centre, Szeged / Omega timekeeping system installation 1
Tiszavirág Swimming Centre, Szeged / Omega timekeeping system installation 2
Tiszavirág Swimming Centre, Szeged / Omega timekeeping system installation 3
Tiszavirág Swimming Centre, Szeged / Omega timekeeping system installation 4
Tiszavirág Swimming Centre, Szeged / Omega timekeeping system installation 5
Background Image
Background Image
More projects
SEPSI OSK Stadium - LED perimeter system expansion

The additional LED perimeter system designed and built for SEPSI OSK Stadium was installed above the fan exits. The idea to install LED perimeters above nine fan exits came from the management of Sepsi OSK, thus expanding the possibilities of visu...

Project details
New Hidegkuti Nándor Stadium: LED Scoreboard Design and Construction - Perimeter and Digital Signage System Operation

In 2016, the stadium underwent a comprehensive renovation project, during which we were entrusted with the installation of two LED scoreboards. Following the construction project, we assume operational control not only over the equipment we have i...

Project details
Background Image